Building service piping transitions through a settlement joint connecting the interior building slab and exterior civil utilities. The pipe rests on a ground floor building slab and is secured to a footing or pile cap using a stainless steel clamp and strut to eliminate strain on fittings. The wrapped pipe assembly incorporates polyethylene wrap and is surrounded by sand backfill installed per manufacturer instructions. A settlement joint is positioned along the run leading to the civil point of connection.
TO CIVIL POINT OF CONNECTION SETTLEMENT JOINT. INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS. SAND BACKFILL PER MANUFACTURERS INSTRUCTIONS POLYETHYLENE WRAP PER MANUFACTURERS INSTRUCTIONS PIPE SUPPORTED GROUND FLR. BUILDING SLAB BUILDING SERVICE PIPING (S, LW, SD, FOR CW) PIPE MOUNTED TO TOP OF FOOTING OR PILE CAP WITH STAINLESS STEEL CLAMP AND STAINLESS STEEL STRUT. SUPPORT AS CLOSE TO SJ AS POSSIBLE TO ELIMINATE STRAIN ON FITTINGS. WRAPPED PIPE ON TOP OF FOOTING OR PILE CAP TO BE INSTALLED PER MANUFACTURER INSTALLATION REQUIREMENTS. EXTERIOR GRADE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership