Cold hard water enters the system through a main supply line equipped with a by-pass valve before branching to the mineral tanks. Each mineral tank connects via inlet and outlet valves, multiport valves, and diaphragm valves to regulate water treatment and regeneration cycles. A brine maker links to the cycle controller to supply brine solution for resin regeneration. Sample cocks and pressure gauges monitor water conditions at key locations, and unions facilitate maintenance piping connections. Treated water exits through the main outlet pipe, with waste lines routed to a drain.
BY-PASS VALVE MAKER BRINE SAMPLE COCK & PRESSURE GAUGE TREATED WATER OUTLET VALVE CYCLE CONTROLLER INLET VALVE MINERAL TANK COLD HARD WATER UNION TYPICAL SAMPLE COCK TYPICAL TO DRAIN MULTIPORT VALVE DIAPHRAGM VALVE CHECK VALVE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership