A finished wall cleanout is installed through a concrete foundation wall above the finished floor level, connecting via a solid pipe and a 90-degree elbow to a perforated drain pipe below. The cleanout manufacturer and product number are per the plumbing schedule. The assembly integrates with the concrete footing, foundation wall, and floor slab construction.
FOOTING FOUNDATION WALL SOLID PIPE PERFORATED DRAIN PIPE WALL CLEANOUT FINISHED WALL CLEANOUT SEE SCHEDULE FOR MANUFACTURER AND PRODUCT NUMBER FINISHED FLOOR
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership