A floor cleanout assembly features a cleanout and access cover set flush with the floor level, connected to a cast iron one-eighth bend with piping sized to match the cleanout. A wall cleanout assembly utilizes a plugged tee with a cleanout behind a chrome wall cover and screw, positioned adjacent to a wall and floor level, with a cast iron bend extending downward and piping matching the cleanout size.
WALL CLEAN-OUT FLOOR CLEAN-OUT AS CLEANOUT TO GRADE. BALANCE OF PIPING SAME 1/8"C.I. BEND MAY EXTEND AS A WASTE OR VENT. CLEANOUT AND ACCESS COVER, TOP OF COVER TO BE FLUSH WITH TOP OF FLOOR. FLOOR LEVEL. CAST IRON 1/8 BEND. BALANCE OF PIPING SAME AS CLEANOUT SIZE. CHROME WALL COVER & SCREW. WALL. PLUGGED TEE WITH CLEANOUT. FLOOR LEVEL.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership