A cleanout and access cover are set flush with the top of the floor line above a cast iron waste line. A length-to-suit vertical section connects to a one-eighth cast iron bend. An additional one-eighth bend occurs at the end of the line where the cleanout ties into the waste piping.
W/TOP OF FLOOR CLEANOUT AND ACCESS COVER TOP OF COVER TO BE FLUSH FLOOR LINE AT END OF LINE LENGTH TO SUIT 1/8 BEND IF CLEANOUT OCCURS WASTE LINE C.I. WASTE LINE 1/8 C.I. BEND
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership