A wall cleanout features a plugged tee with a cleanout plug terminating at a chrome wall cover and screw flush with the wall surface, connecting to cast-iron piping that may extend as a waste or vent. A floor cleanout incorporates a cleanout and access cover set flush with the top of the floor slab, connected to cast-iron bend and balance piping below.
WALL CLEANOUT FLOOR CLEANOUT CLEANOUT & ACCESS COVER TOP OF COVER TO BE FLUSH W/ TOP OF FLOOR FLOOR LINE 1/8" C.I. BEND BALANCE PIPING 1/8" C.I. BEND BALANCE PIPING FLOOR LINE PLUGGED TEE W/ CLEANOUT WALL CHROME WALLCOVER & SCREW MAY EXTEND AS A WASTE OR VENT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership