The floor cleanout consists of a cleanout and access cover flush with the finished floor level, connected to a cast iron one-eighth bend with the balance of piping matching the cleanout size. The wall cleanout features a plugged tee with a cleanout, a chrome wall cover and screw secured at the wall face, and a one-eighth cast iron bend extending to waste or vent piping.
WALL CLEAN-OUT FLOOR CLEAN-OUT AS CLEANOUT TO GRADE. BALANCE OF PIPING SAME 1/8"C.I. BEND MAY EXTEND AS A WASTE OR VENT. CLEANOUT AND ACCESS COVER, TOP OF COVER TO BE FLUSH WITH TOP OF FLOOR. FLOOR LEVEL. CAST IRON 1/8 BEND. BALANCE OF PIPING SAME AS CLEANOUT SIZE. CHROME WALL COVER & SCREW. WALL. PLUGGED TEE WITH CLEANOUT. FLOOR LEVEL.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership