An underground four-inch sanitary waste pipe transitions through a nine-degree elbow up through the first floor concrete slab into a vertical four-inch pipe. The vertical stack incorporates a full-size cleanout with a wall cleanout and cover flush to the wall finish. The pipe size increases to four inches upstream of the cleanout, connecting to a reduced vertical waste line. This installation applies specifically to locations where the clear wall cavity dimension exceeds the outside diameter of the four-inch underground pipe.
4" SAN PIPE UNDERGROUND FIRST FLOOR SLAB INCREASE TO 4" UPSTREAM OF CLEANOUT REDUCED VERTICAL WASTE LINE WALL CLEANOUT AND COVER FULL SIZE CLEANOUT 4" VERTICAL PIPE THIS DETAIL APPLIES TO LOCATIONS WHERE CLEARANCE IN WALL CAVITY IS GREATER THAN OUTSIDE DIAMETER OF 4" UNDERGROUND PIPE CLEAR WALL CAVITY GREATER THAN O.D. OF 4" UNDERGROUND PIPE NOTE: