A cleanout and access cover is installed with the top of the cover flush with the finished floor line. A vertical waste pipe connects through a one-eighth bend fitting to the main waste line below the slab.
FLOOR CLEANOUT FLOOR LINE WASTE LINE 1/8" BEND CLEANOUT AND ACCESS COVER. TOP OF COVER TO BE FLUSH WITH TOP OF FLOOR.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership