A vision glazing unit extends vertically past the metal deck concrete floor slab with structural framing anchored near the slab edge. A level datum marks Level 15 at an elevation of 184 feet 2 inches with a vertical dimension of 1 foot 5 7/8 inches to the framing transition. A detail reference bubble for detail 2 on sheet A862 encloses the transition zone.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership