An underground natural gas pipe penetrates a concrete structure passing through a schedule 40 welded steel sleeve fitted with an interstitial spacer. The steel gas line transitions to a polyethylene gas line using a pre-fabricated steel-to-polyethylene transition fitting. A steel nipple connects to the sleeve and transitions to a one-and-a-half-inch relief line terminated above ground with a gooseneck and insect screen.
CONCRETE STRUCTURE UNDERGROUND NATRUAL GAS PIPE INTERSTITIAL SPACER GAS LINE UNDER CONCRETE STRUCTURE SECTION - AT PIPE SLEEVE ENDS 1 1 /2 "∅ RELIEF TERMINATED ABOVE GROUND WITH GOOSENECK AND INSECT SCREEN. SEE PLAN FOR LOCATIONS. 3/16 " 3/16 " POLYETHYLENE GAS LINE STEEL GAS LINE PRE-FABRICATED STEEL - POLYETHYLENE TRANSITION 3/16 " STEEL NIPPLE SCHEDULE 40 WELDED STEEL SLEEVE