Perforated schedule 40 PVC piping collects soil gases beneath the concrete slab within a coarse gravel layer. A non-perforated schedule 40 PVC main pipe connects via a PVC tee or cross fitting. Section A-A indicates a specific angular configuration for the internal pipe drops and gravel placement beneath the finished floor.
A SECTION A-A ELEVATION 60° 60° FINISHED FLOOR 100 PERFORATED SCH 40 PVC PIPING 100 SCH 40 PVC MAIN PIPE (NON-PERFORATED) 200 GRAVEL LAYER A 100 X 100 X 100 SCH 40 PVC TEE OR CROSS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.