A car wash bay conveyor correlator trench is embedded directly into the concrete floor slab. The correlator frame is set in place prior to the concrete pour so the frame is poured monolithically into the floor. A six-inch PVC correlator drain connects at an angle from the bottom of the correlator trench to the adjacent conveyor pit.
CORRELATOR TRENCH ELEVATION SECTION "E-E" 6" PVC CORRELATOR DRAIN (ANGLED FROM BOTTOM OF CORRELATOR TRENCH TO CONVEYOR PIT) CORRELATOR TRENCH CORRELATOR SET IN PLACE PRIOR TO CONCRETE POUR. CORRELATOR FRAME POURED INTO FLOOR 8" 6" 39
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership