This assembly features a cleanout tee installed within a wall cavity, connected to a vertical pipe that may extend as a waste or vent line. The cleanout is accessed through the wall finish via a chrome wall cover secured with a screw. Below the finished floor, the assembly transitions to a one-eighth cast iron bend, with the remaining piping configuration matching standard floor cleanout requirements.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership