A heat recovery chiller unit is secured to a tube steel mounting rail using bolted or welded attachments per the seismic anchorage submittal. The mounting rail bears on a neoprene pad resting atop a concrete pad provided by the general contractor as shown on the plans.
NEOPRENE PAD BOLTED OR WELDED UNIT ATTACHMENT PER SEISMIC ANCHORAGE SUBMITTAL. CONCRETE PAD BY G.C, AS SHOWN ON PLANS TUBE STEEL MOUNTING RAIL BASEMENT HRCH B1-1
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership