The buffer tank is secured to a concrete equipment pad by the general contractor as shown on the plans. Mounting brackets are installed per the structural submittal. The tank features low inlet and outlet connections and is located in the basement.
MOUNTING BRACKETS PER STRUCTURAL SUBMITTAL CONCRETE EQUIPMENT PAD BY G.C. AS SHOWN ON PLANS BUFFER TANK LOW INLET AND OUTLET BASEMENT BT B1-X
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership