An air separator vessel is installed on a concrete equipment pad located in the basement. The unit is anchored using mounting brackets provided per structural submittal. The concrete equipment pad is installed by the general contractor as shown on the architectural and structural plans.
MOUNTING BRACKETS PER STRUCTURAL SUBMITTAL CONCRETE EQUIPMENT PAD BY G.C. AS SHOWN ON PLANS AIR SEPARATOR BASEMENT AS B1-X
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership