A sheet lead flashing sleeve penetrates the roof construction, mopped directly into the surrounding roofing material with a minimum twelve-inch horizontal flange extension. The top of the lead flashing is turned down over the rim into the stack. A sleeve is installed around the roof construction as required.
SHEET LEAD FLASHING MOP IN WITH ROOFING MATERIAL MIN. 12" SLEEVE ROOF CONSTRUCTION AS REQUIRED ROOF CONSTRUCTION MIN. 12" ROOFING TURN LEAD DOWN INTO STACK
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership