Insulated pipework rests atop a three-sided tubular channel support system supported by injection-molded high-density, high-impact polypropylene bases that require no direct connection to the roof. The assembly bears directly on the finished roof over a concrete roof slab, maintaining a minimum clearance of 36 inches in climates with snow loads and 18 inches in all other acceptable climates. Seismic bracing is provided where required per note 3. Saddles and shields are included as required per mechanical specifications.
PIPEWORK MOUNTED WITH EXTERIOR INSULATION INJECTION MOLDED HIGH DENSITY HIGH IMPACT POLYPROPYLENE BASE. NO CONNECTION TO ROOF REQUIRED. THREE-SIDED TUBULAR CHANNEL SUPPORT SYSTEM CONC. ROOF SLAB FINISHED ROOF 36" MIN IN CLIMATES WITH SNOW LOADS. ALL OTHERS 18" MIN IS ACCEPTABLE" SEISMIC BRACING WHERE REQUIRED. SEE NOTE 3. PROVIDE SADDLE AND SHEILD AS REQUIRED PER MECHANICAL SPECIFICATIONS.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership