A two-inch waste pipe extends upward from a horizontal two-inch pipe passing through a structural concrete footing, routed through millwork casework with exposed waste and vent piping segments. A foam blockout surrounds the riser at the concrete slab transition with four-inch and two-inch dimensional clearances. The vent pipe transitions from an exposed run inside the casework to a concealed vent pipe running vertically within the wall cavity.
FOAM BLOCKOUT AROUND RISER AT SLAB 2" 4" 2" PIPE STRUCTURAL FOOTING EXPOSED VENT PIPE IN CASEWORK EXPOSED WASTE PIPE IN CASEWORK CONCEALED VENT PIPE IN WALL SIDE VIEW 2" PIPE