Low pressure duct routing is laid out with specific clearance requirements. A minimum of five feet is required before any turning vane and before any takeoff. The system includes round and rectangular duct segments transitioning to a flexible duct connection.
MINIMUM 5 FEET BEFORE TURNING VANE MINIMUM 5 FEET BEFORE TAKEOFF MINIMUM 10" ROOFING AT ROUND STRUCTURAL STRUCTURAL ENGINEER
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership