The floor cleanout assembly features a heavy duty access frame and cover set flush with the top of the finished floor, connecting to a PVC cleanout plug and ferrule over waste piping equipped with an eighth-bend and a forty-five degree wye. The wall cleanout assembly utilizes a plugged tee with cleanout set within a wall line, finished with a chrome wall cover and screw. The vertical waste or vent line extends upward through the wall assembly while tying into the horizontal waste piping below.
ACCESS FRAME AND COVER TOP OF COVER SHALL BE FLUSH W/TOP OF FLOOR. PVC CLEANOUT PLUG AND FERRULE WASTE PIPING FINISHED FLOOR HEAVY DUTY 1/8" BEND WYE WALL LINE WITH CLEANOUT PLUGGED TEE COVER AND CHROME WALL FINISHED FLOOR WASTE OR VENT MAY EXTEND AS A SCREW 1/8" BEND (TYPICAL) 45 WYE (TYPICAL) WASTE PIPING SCALE: 2 WALL CLEANOUT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership