The pump and motor rest upon a steel pump isolation base supported by spring isolators with an inertia base as indicated on the equipment schedule and vibration isolation submittal. The entire assembly sits on a concrete equipment pad by the general contractor. A suction diffuser connects to the pump, and auxiliary connections are routed per the mechanical plans.
SPRING ISOLATORS WITH INERTIA BASE AS INDICATED ON EQUIPMENT SCHEDULE AND VIBRATION ISOLATION SUBMITTAL SUCTION DIFFUSER STEEL PUMP ISOLATION BASE PUMP AND MOTOR CONCRETE EQUIPMENT PAD BY G.C. AS SHOWN ON PLANS SEE SHEET M1.6.01 AND M1.6.02 FOR PUMP TRIM BASEMENT CHWP B1-X HWP B1-X SSP B1-X