This diagram details the piping layout for a boiler gas train, featuring a three-inch branch line connecting to a main distribution header. A note specifies a minimum four-inch pressure and a maximum fourteen-inch pressure required at the boiler gas train by the plumbing contractor. A dielectric union is required at all copper-to-steel connections to prevent galvanic corrosion.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership