The system includes an eight-inch cold water supply line connected to parallel variable frequency drive pumps P-5 and P-6, along with an expansion tank ET-2 and an eight-inch cold water return line. A storage tank and heating water lines tie into the network with three-quarter-inch piping connections. An emergency shut-off and an eight-inch pressure switch are provided by the water treatment contractor and installed by the plumbing contractor.
OFF HIGH LOW GLY COL F E E D 1 OFF HIGH LOW GLY COL F E E D 3 OFF HIGH LOW GLY COL F E E D 2 E ME RGE NCY S HUT OF F AS-2 ET-2 8" Pressure switch provided by water treatment contractor, installed by plumbing contractor. 3/4" 14 M6.2 P-6 P-5 TYP. 8" 7 M6.2 3/4" 15 M6.2 8" STORAGE TANK (VFD) (VFD) HEATING WATER CWS CWR