Refrigerant piping penetrates a roof curb with a minimum 12-inch clearance to the top of the curb. Pipe lines are secured with Hydro-Zorb or Cush-A-Clamp mounted to Unistrut anchored to the curb. Openings are filled with foam insulation after lines are installed. A twenty-gauge galvanized sheet metal hood is installed over the penetration after pipe lines are set by the mechanical contractor, accompanied by roof flashing provided by the general contractor.
6' MIN FILL OPENING FOAM INSULATION AFTER LINES ARE INSTALLED UNISTRUT ANCHORED TO CURB CLAMP PIPE LINES WITH HYDRO-ZORB OR CUSHA CLAMP 20 GAL. GALVANIZED SHEET METAL HOOD TO BE INSTALLED AFTER PIPE LINES ARE SET BY M.C. 12" MIN. TO TOP OF CURB ROOF FLASHING BY G.C. ROOF CURB BY G.C.