A ball valve installation on a poly vinyl chloride schedule 80 piping system is housed inside a valve box with a locking purple cover. The valve is connected via nipples and a union, positioned at a specified height above the finish grade. The piping rests on unmortared brick supports over a cubic foot concrete footing and a six inch deep pea gravel sump. Finish grade and pipe depths comply with project specifications.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership