Decomposed granite paving with stabilizer is installed at a thickness of three inches over a non-woven soil separator fabric. The underlying subgrade is prepared per the geotechnical report for compaction, scarification, and over-excavation. A concrete mow curb is provided at the perimeter per project specifications.
3" 1 2 3 1 2 3 NOTE: A. CONCRETE MOW CURB PER B. NATIVE OR FILL SOIL SUPPORTING EXTERIOR NON-STRUCTURAL FLATWORK AND UNPAVED LANDSCAPING AREAS ARE EXEMPT FROM SPECIAL INSPECTION AND TESTING. 10 - DECOMPOSED GRANITE PAVING W/ 'STABILIZER'. REFER TO SPECIFICATIONS & MATERIALS PLAN SOIL SEPARATOR FABRIC "MIRAFI" 140N REFER TO GEOTECH REPORT FOR SUBGRADE COMPACTION, SCARIFICATION, AND OVER EXCAVATION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership