A cast-in-place concrete construction joint between a first and second pour over a prepared sub-base. A number four tie bar is cast into the first pour at twelve inches on center across the joint interface. The joint features a quarter-inch depth scoring profile at the surface.
CONCRETE FIRST POUR CONSTRUCTION JOINT E. CONSTRUCTION JOINT CONCRETE SECOND POUR #4 TIE BAR CAST IN FIRST POUR @ 12" O.C. 1'-0" 1'-0" 3" 0" 1/4" DEPTH 1