A rubber base transitions the junction between the finish floor and laboratory casework, positioned per the finish plan and schedule. Chemical resistant welded seam rubber flooring is installed across the finish floor. Laboratory casework is coordinated per the lab planning drawings. The floor assembly transitions directly into the wall-mounted casework toe space.
FINISH FLOOR RUBBER BASE, PER FINISH PLAN AND SCHEDULE LAB CASEWORK, REF. LAB PLANNING DRAWINGS CHEMICAL RESISTANT WELDED SEAM RUBBER FLOORING PER FINISH PLAN AND SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership