The assembly features a sump pump housed within a sump pit, connected to a pumped discharge line that includes a union, check valve, and shut-off valve. Power and control cords run from the pump to high water alarm, pump on, and pump off float switches mounted along the shaft. The discharge piping routes upward toward the ceiling before tying into an alternate route and a main gravity line with a two percent slope. The layout indicates standard plumbing integration between the subgrade sump pit and overhead utility routing.
SUMP CHECK VALVE SHUT OFF VALVE UNION SUMP PUMP SHAFT PUMPED DISCHARGE ALTERNATE ROUTE FLOOR MAIN GRAVITY LINE 2 1 4 2% POWER AND CONTROL CORDS HIGH WATER ALARM PUMP ON PUMP OFF CEILING 3
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership