Sod with tight beveled joints is installed over an amended soil layer, set one inch below the top of the adjacent concrete paving. The soil layer requires a minimum of five inches of topsoil.
SOD TIGHT BEVELED JOINTS AMENDED SOIL CONCRETE PAVING 1" NOTE: 1. INSTALL OVER MINIMUM 5" TOPSOIL LAYER.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership