A compacted decomposed granite path is installed at a minimum depth of three inches, held down half an inch from the top of the adjacent metal edge and existing concrete paving. The assembly rests on a four-inch minimum depth aggregate base over a compacted sub-grade, with geotextile fabric placed beneath the base and separating the path from adjacent mulch beds. Contractors must ensure positive drainage across the path to avoid low spots and puddling.
NOTES: 1. CONTRACTOR TO ENSURE POSITIVE DRAINAGE ACROSS PATH - DO NOT CREATE LOW SPOTS CREATING PUDDLES. COMPACTED DECOMPOSED GRANITE, 3" MIN. DEPTH. HOLD DOWN 1/2" FROM TOP OF METAL EDGE AND CONCRETE PAVING. AGGREGATE BASE, 4" MIN. DEPTH COMPACTED SUB-GRADE EXISTING CONCRETE PAVING GEOTEXTILE FABRIC MULCH (SEE PLAN FOR DEPTH) GEOTEXTILE FABRIC A L4.05