The subgrade consists of an undisturbed layer below a first lift of topsoil rototilled directly into the subgrade. A second lift of topsoil is placed above, finished flush with adjacent curbs and sidewalks at the finish grade. All planting areas must be compacted to a maximum density of eighty-five percent. If compaction exceeds this limit, the contractor is required to rip or plow the subgrade to a twelve-inch depth.
PER SPEC SECOND LIFT OF TOPSOIL FINISH GRADE FIRST LIFT OF TOPSOIL, ROTOTILLED INTO SUBGRADE EXISTING SUBGRADE UNDISTURBED SUBGRADE ALL PLANTING AREAS TO BE PREPARED WITH TOPSOIL AS SHOWN IN THIS DETAIL. FINISH GRADE IS FLUSH WITH TOP OF CURBS AND SIDEWALKS. COMPACT SUBGRADE AND TOPSOIL TO A MAXIMUM DENSITY OF 85% IN ALL PLANTING AREAS. IF COMPACTION EXCEEDS 85%, CONTRACTOR SHALL RIP OR PLOW SUBGRADE TO A 12" DEPTH. NOTES 1. 2. 3.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.