A track matching the studs is installed above the vertical studs, which are sized per schedule. Closure tracks per schedule are connected using number ten sheet metal screws spaced at eight inches on center typically. Additional tracks tie the assembly together at the top and bottom of the box header.
TRACK TO MATCH STUDS CLOSURE TRACK PER SCHED #10 SMS @ 8" OC, TYP ABOVE VERT STUDS, ES PER SCHED A SINGLE BOX HEADER CONFIGURATION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership