A construction joint in a concrete slab over a metal deck is oriented parallel to the deck span. The joint separates the first pour from the subsequent pour along a designated centerline. Shear keys measuring two feet long by depth are specified across the joint per the reference to drawing five on sheet L-O S1.3.3.
KEYS 2'-0"LONGxDEPTH. SEE CJ SUBSEQUENT POUR 1ST POUR "A-A" (PARALLEL TO DECK SPAN) B B C L / 5 LO S1.3.3
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership