A typical cleanout is installed at the base of an existing building wall on a level bottom surface with the elevation determined per the project plan. The installation requires coordination with the existing building structure to ensure proper drainage and access.
POP-UP SPRAY HEAD OR ROTOR PRE-FABRICATED SWING JOINT ASSEMBLY DETECT-A-TAPE IN TRENCH SCH 40 PVC LATERAL PVC SCH 40 TEE OR ELL SLIP X FIPT X SLIP TRACE WIRE NOTE: LATERAL LINES FOR ROTORS WILL BE INSTALLED ABOVE GROUND ON STAKED PVC ASSEMBLAGE AND LIGHTLY COVERED WITH MULCH, TO FACILIATE DISASSEMBLY AFTER ESTABLISHMENT OF PLANT MATERIAL. ENSURE PROPER DRAINAGE AND WINTERIZATION PRIOR TO FREEZING TEMPERATURES.