A rigid steel conduit sweep elbow transitions underground from a vertical run down to horizontal below finish grade. The top of the sweep is positioned eighteen inches below the finish grade line. The conduit features a minimum twelve-inch radius elbow located adjacent to the concrete foundation wall and floor slab.
FLOOR FINISH GRADE RIGID STEEL CONDUIT SWEEP ELBOW, 12" RADIUS MIN. 18"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership