An infield mix without stabilizer sits over a base material and compacted subgrade with a three inch depth. Concrete paving occurs adjacent to the infield mix with a maximum quarter inch separation tolerance. The subgrade and base materials are installed per the geotechnical report with color per the materials plan.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership