The schematic outlines a laboratory recirculation system linking flexible and changing lab tanks with the main recirculation setup. Supply and return lines designated as SWS and SWR connect the primary tanks to the recirculation units typical of three installations. Additional process streams include overflow lines labeled O/F, high-purity water make-up, and specific waste drain connections.
LAB TANKS ON RECIRCULATION (FLEXIBLE/CHANGING) RECIRC SYSTEMS FOR LABS SWS SWR O/F O/F HSWD MSWD FSWMU (TYP OF 3) FWMU
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership