Text on the drawing
FUME HOOD PRE- PIPING UNDER DIV. 11 UTILITY CHASE FUME HOOD TOP REFER TO FLOOR PLANS FOR REQUIRED SERVICES PIPING TO FUME HOOD POINT OF CONNECTION UNDER DIVISION 22, 6" ABOVE SUPERSTRUCTURE FUME HOOD SUPERSTRUCTURE PIPE SERVICES LOCATED BETWEEN DUCT TRANSITION AND FLUORESCENT LIGHT FIXTURE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe