A one-half-inch thick top layer of poured-in-place rubber is installed over a five-inch base layer of poured-in-place rubber. The rubber system rests upon a concrete layer sized per civil drawings. Below the concrete sits a compacted aggregate base and a compacted subgrade, both detailed on civil drawings.
1/2" THK TOP LAYER POURED IN PLACE RUBBER 5" BASE LAYER POURED IN PLACE RUBBER CONCRETE, SEE CIVIL DRAWING COMPACTED AGGREGATE BASE, SEE CIVIL DRAWING COMPACTED SUBGRADE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership