A one-quarter-inch by five-inch steel header secures the edge between a planting area and decomposed granite surfacing. The steel header is anchored with fifteen-inch long stakes driven into the subgrade. A maximum one-half-inch clearance is maintained at the planting edge interface.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership