Floor tile finishes align on each side of a metal transition strip designated as MT01 for a flush transition. An interior door is positioned directly above the transition joint where it occurs. The tile finishes are installed per finish plans over the underlying substrate.
INTERIOR DOOR, WHERE OCCURS FLOOR TILE, PER FINISH PLANS FLOOR TILE, PER FINISH PLANS METAL TRANSITION, MT01 FOR FLUSH TRANSITION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership