A dark bronze metal trim piece, designated MTL-05, is recessed horizontally between scheduled porcelain wall tiles over a grout layer and continuous tile backer board. The assembly is framed by a scheduled partition with alignment indicators marking the transition points. A dimension point locates the three-inch high horizontal joint relative to the wall construction.
DIM POINT SCHEDULED PARTITION CONTINUOUS TILE BACKER BD GROUT SCHEDULED PORCELAIN WALL TILE ALIGN ALIGN DK BRONZE TRIM PIECE, MTL-05 3"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership