This interior wall transition detail shows a scheduled porcelain wall tile set in grout over a continuous tile backer board, aligning with a scheduled wood trim piece. The lower portion of the assembly features a one-half-inch veneer plywood panel attached with Z-clips over a scheduled partition. Additional blocking or backing is installed as required behind the substrates to maintain flush surface alignments at the transition joint. A one-quarter-inch gap and dimension reference point coordinate the junction between the tile and panel systems.
DIM POINT SCHEDULED PARTITION CONTINUOUS TILE BACKER BD GROUT SCHEDULED PORCELAIN WALL TILE ALIGN ALIGN SCHEDULED TRIM 1/4" 1/2" VENEER PLYWOOD PANEL, Z- CLIP ATTACHMENT ADD'L BACKING AS REQ'D TO MAINTAIN ALIGNMENTS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership