A spill containment dike is installed over existing concrete or asphalt pavement using adhesive. The apron on the specified side of the dike is folded under per section requirements and glued down to the substrate. Overlaps are sealed in accordance with the manufacturer's recommendations.
APRON ON THIS SIDE OF THE DIKE MUST BE FOLDED UNDER THE DIKE SECTION 500 AND GLUED DOWN CONSTRUCTION AREA ASPHALT PAVEMENT EXISTING CONCRETE OR SECTION A PLAN VEIW ADHESIVE FLOW ADHESIVE ADHESIVE ADHESIVE ADHESIVE ADHESIVE FLOW OVERLAP PER MANUFACTURER'S RECOMMENDATIONS EXISTING CONCRETE OR ASPHALT PAVEMENT 500 500 A GC501 A GC501
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership