A composite metal deck floor slab supported by a steel beam meets the exterior pre-finished aluminum curtain wall assembly at level twenty. The floor level is established at elevation two hundred eighty-five feet zero inches. Pre-finished aluminum material type E-MTL-01 is indicated at the spandrel or frame junction. A reference tag directs to detail one on sheet A4.70.4 for further connection information.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership