Signage is mounted to the wall assembly with a two-inch backer stand-off. The general contractor provides wood blocking within the wall cavity to support the signage attachment.
2" 2" BACKER STAND-OFF SIGNAGE SCHEDULE WALL, SEE ELEVATIONS NOTE: GC TO PROVIDE WOOD BLOCKING AT WALL CAVITY TO SUPPORT SIGNAGE ATTACHMENT.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership