A concrete footing extension anchored to an existing footing with epoxy-set dowels. Two number six vertical reinforcing bars and two number six hooked dowels are epoxied into the existing footing extension, complemented by three number four hooks. An additional two number six vertical bars are epoxied directly into the existing footing. Number four ties are spaced at one foot on center around the vertical reinforcement.
1'-7" 1'-0" 11" 4" 1'-0" 4" 1'-8" #4 TIES @ 1'-0" O.C. ( 2 ) #6 VERT ( 2 ) #6 VERT ( 2 ) #6 DWL EPOXY INTO (E) FTG ( 2 ) #6 DWL HK INTO FTG EXTENSION ( 3 ) #4 HOOKS EPOXY DWL TO (E) FTG #4 HOOKS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership